Hydraulic studies of the throughput of the water intake structure of the Tuyamuyun hydroelectric complex
1 Tashkent architectural and construction institute, Tashkent, Uzbekistan
2 Tashkent Institute of Irrigation and Agricultural Mechanization Engineers, Tashkent, Uzbekistan
* Corresponding author: husan_1954@mail.ru
The article presents the results of experimental studies to determine the throughput of the right-bank water intake structure and bottom galleries, the hydraulic regime in the galleries, and the movement of bottom sediments in them. Based on the results of the studies, a series of curves were obtained for the dependence of the discharge on the water horizon in the upper pool and the value of the opening of the gate of the intake structure. Checking the work of the galleries together with the working water intake holes showed that there is no mutual influence of them on each other. The total consumption of water passed through the water intake and galleries is practically equal to the sum of the consumption of water passed through these structures separately. It was found that the main amount of sediment accumulated in the headwater will fall into the left gallery, while slightly less (about one third) will fall into the right span, and only a small remainder leaves through the weir, while the water flow rate was distributed as follows: Qgal = 1.65Qwater.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.