Issue |
E3S Web Conf.
Volume 274, 2021
2nd International Scientific Conference on Socio-Technical Construction and Civil Engineering (STCCE – 2021)
|
|
---|---|---|
Article Number | 01032 | |
Number of page(s) | 8 | |
Section | Architecture and Planning | |
DOI | https://doi.org/10.1051/e3sconf/202127401032 | |
Published online | 18 June 2021 |
Naberezhnye Chelny – implementation roadmap of the Master Plan-2022
Kazan State University of Architecture and Engineering, 420043, Kazan, Russia
* Corresponding author: adelyasaif@rambler.ru
Currently, there is an actual issue of the low efficiency of the solutions implementation laid down in the urban planning documentation of the settlements master plan. This article discusses the key reasons that lead to such low implementation rates. Using the example of the developed Master Plan of the city of Naberezhnye Chelny for 2023-2037, the authors consider the roadmap not only as a key tool for increasing the efficiency of the implementation of urban planning documentation, but also as a way of correlating these solutions with the three-year planning cycle adopted in the legislation of the Russian Federation. The results of the study are the justified stages of the solutions implementation of the developed master plan with the points of growth of the city defined for each period.
Key words: Master plan / implementation roadmap / urban planning documentation / strategic planning / points of growth / Naberezhnye Chelny
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.