Issue |
E3S Web Conf.
Volume 276, 2021
2021 5th International Conference on Water Conservancy, Hydropower and Building Engineering (WCHBE 2021)
|
|
---|---|---|
Article Number | 01021 | |
Number of page(s) | 4 | |
Section | Water Conservancy and Hydropower and Natural Geological Exploration | |
DOI | https://doi.org/10.1051/e3sconf/202127601021 | |
Published online | 23 June 2021 |
A Constitutive Model Incorporating Mixed Soil Slurry for Interface
Powerchina Zhongnan Engineering Corporation Limited, Changsha, Hunan Province, 410014, China
* Corresponding author's e-mail: 02509@msdi.cn
In projects, mixed soil slurry between cut-off wall and coarse-grained soil always exists. It may influence on or change mechanical properties of interface between coarse-grained soil and structure. The mechanical behaviors of the interface between coarse-grained soil and concrete were investigated by simple shear tests under mixed soil slurry. The significant dilatancy and stress-strain softening can be achieved through the results, which also indicate that the cement content play an important role in the shear strength of the interface. The peak strength and the position when the dilatancy occurs are related to both normal stress and cement content. An elasto-plastic constitutive model for interface considering mixed soil slurry was formulated in the framework of generalized potential theory. The entire model parameters can be identified by experimental tests. Finally, the predictions of the model have been compared with experimental results, and results show the model is reasonable and practical.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.