Issue |
E3S Web Conf.
Volume 276, 2021
2021 5th International Conference on Water Conservancy, Hydropower and Building Engineering (WCHBE 2021)
|
|
---|---|---|
Article Number | 01034 | |
Number of page(s) | 10 | |
Section | Water Conservancy and Hydropower and Natural Geological Exploration | |
DOI | https://doi.org/10.1051/e3sconf/202127601034 | |
Published online | 23 June 2021 |
Research on Water Conservancy Project Construction and Operation Management based on Cost Management
Gansu Provincial Yintao Project Construction Administration, Lanzhou, Gansu 730000
Email: 517358956@qq.com
With the development and progress of the economy and society, the management level of my country’s construction projects has also been greatly improved, especially in the construction of water conservancy projects, and the cost management in the process has made significant progress; the water conservancy industry is in order to improve the market of enterprises. Competitiveness, to increase the market share of the company, it is necessary to improve the management level of the company in an all-round way, and maximize the economic benefits of the company.In order to improve the efficiency of cost management and operation management in the construction of water conservancy projects, this study conducts a theoretical analysis of the project cost management, taking the reinforcement treatment of the expansion joints of the culverts of the main canal project of the first phase of the water diversion water supply as a research case, and analyzes the expansion joints of the culverts of the project. This paper conducts a comprehensive investigation, proposes a repair plan using chemical bonding with external TPO waterstop and PTN petroleum asphalt polyurethane joint material, and makes a detailed investment estimate for project implementation. The results show that the bonding externally attached TPO waterstop and PTN petroleum asphalt polyurethane joint materials can meet the needs of this design for strengthening and strengthening the waterstop of the expansion joint of the culvert. The total static investment of construction engineering, mechanical and electrical equipment and installation engineering, construction temporary engineering, independent costs and basic reserve costs is 4,585,800 yuan, of which the total cost of underdrain expansion joint treatment is 3,594,600 yuan, which is in line with expectations, indicating that the water conservancy project of this design. The cost management plan is feasible.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.