Issue |
E3S Web Conf.
Volume 280, 2021
Second International Conference on Sustainable Futures: Environmental, Technological, Social and Economic Matters (ICSF 2021)
|
|
---|---|---|
Article Number | 05008 | |
Number of page(s) | 7 | |
Section | Sustainable Energy | |
DOI | https://doi.org/10.1051/e3sconf/202128005008 | |
Published online | 30 June 2021 |
Workability conditions determination of network distribution with overhead lines power transmission with the 6-35 kV
1 Vinnytsia National Technical University, 95 Khmelnitsk highway, Vinnytsya, 21021, Ukraine
2 Scientific and technical center «Instrument-mikro», 68 Oktyabrskaya Str., Kvasnikovka village, Engelsky district, Saratov region, 413138, Russia
* Corresponding author: vmkytin@gmail.com
The principal of identification of isolation workability in relation to a ground was proposed. It is based on the electrosafety criteria usage and a minimum current flow to a ground. The conditions of workability of isolation of distribution network is calculated in look of changes of isolation workability restrictions in relation to regulations and standards. A mathematical model for the calculation of isolation workability in a look of a relation of workability indicators to the isolation parameters according to a ground. By analyzing the adequacy it as set that introduced formed models assumptions result in the appearance of a method error to 3,5 %.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.