Issue |
E3S Web Conf.
Volume 283, 2021
2021 3rd International Conference on Civil, Architecture and Urban Engineering (ICCAUE 2021)
|
|
---|---|---|
Article Number | 02039 | |
Number of page(s) | 5 | |
Section | Urban Planning and Protection of Natural Environment Facilities | |
DOI | https://doi.org/10.1051/e3sconf/202128302039 | |
Published online | 07 July 2021 |
A Research on Public Space Planning of Rural Architecture Based on Villagers’ Perception: A Case Study of Xingjing Town, Xixia District, Yinchuan City, Ningxia Province
Ningxia College of Construction,355 Xueyuan East Road, Xixia District, Yinchuan City, Ningxia Hui Autonomous Region, 750021, China
* Corresponding author: 233122167@qq.com
In the context of rapid global urbanization, rural villagers’ demand for public space is increasing. This article understands the development of rural public space through the perception of villagers. Using literature research method, questionnaire survey method, field investigation method and other methods, the investigation results of villagers’ behavior in rural public spaces and villagers’ satisfaction were analyzed. The study found that the villagers’ demand for public space is mostly in terms of accessibility, good landscape, and good environment. The villagers hope that the town can have more public spaces to enrich life. Therefore, based on the conclusions of villagers’ perception survey and research, this article studies the planning and design strategies of rural architecture public spaces.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.