Issue |
E3S Web Conf.
Volume 295, 2021
International Scientific Forum on Sustainable Development and Innovation (WFSDI 2021)
|
|
---|---|---|
Article Number | 03008 | |
Number of page(s) | 8 | |
Section | Sustainable Development and Ecology | |
DOI | https://doi.org/10.1051/e3sconf/202129503008 | |
Published online | 26 July 2021 |
Studies on zinc recovery from technogenic waste
1
University of Mining and Geology, 1700 Sofia, Bulgaria
2
Bulgarian Academy of Sciences, 1000 Sofia, Bulgaria
* Corresponding author: marichim@mgu.bg
Results from laboratory experiments are presented on extraction of zinc available in waste from lead-zinc metallurgy, mixed with lead-zinc flotation tailings and some waste rock, by leaching it under atmospheric conditions with sulfuric acid (H2SO4) solutions (5 and 10 wt. %) and 30 % hydrogen peroxide in the temperature range of 25 - 80 °C, at leaching time 30 - 120 min. Material leaching with 10 % H2SO4 solution at 70 °C for one hour brings into pregnant leach solution (PLS) around 80 % of zinc available. Imposing an electrochemical impact during the leaching process increases the quantity of leached zinc by around 5 %. Direct electrowinning from the PLS obtains zinc metal of grade 75-76 %. The suggested treatment removes metals-pollutants from accumulated mixed technogenic waste therefore rendering it more environmentally friendly. Experiments showed that old mixed waste from mining, mineral processing and metallurgy activities merits further studies as secondary source of metals.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.