Issue |
E3S Web Conf.
Volume 296, 2021
1st International Conference on Environmental Sustainability Management and Green Technologies (ESMGT 2021)
|
|
---|---|---|
Article Number | 02006 | |
Number of page(s) | 6 | |
Section | Resource Conservation and Sustainable Consumption and Production Patterns | |
DOI | https://doi.org/10.1051/e3sconf/202129602006 | |
Published online | 28 July 2021 |
Road and environment
1 Ural State Transport University, Kolmogorova st., 66, 620034 Ekaterinburg, Russia
2 Saint Petersburg State Transport University named after the Emperor Alexander I, Northwestern Federal District, Moscow avenue, 9, 190031 Saint Petersburg, Russia
3 Sibir State Transport University, Dusi Kovalchuk st., 191, 630049 Novosibirsk, Russia
* Corresponding author: GAkkerman@usurt.ru
A railway at all stages of its life cycle (design, construction, operation) interacts with the environment. The environment can be divided into two components, which, depending on the geographical location of the area and its economic development, are characterized by their regional factors. Natural: climate, relief, geology, hydrology, etc. Economic: the development of the area, the density of population and transport networks, industry, etc. The environment affects the choice of the main technical parameters of the railway, design characteristics, methods of construction and operation, and therefore, construction and operating costs. For the analysis of regional factors, a conditional parameter is adopted, the value of which changes in the same direction as the regional parameters. The regression equation between these parameters and the construction cost of 1 km of railway in the considered areas was revealed.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.