Issue |
E3S Web Conf.
Volume 309, 2021
3rd International Conference on Design and Manufacturing Aspects for Sustainable Energy (ICMED-ICMPC 2021)
|
|
---|---|---|
Article Number | 01190 | |
Number of page(s) | 6 | |
DOI | https://doi.org/10.1051/e3sconf/202130901190 | |
Published online | 07 October 2021 |
A Fuzzy Controlled LCC HVDC System with AC Voltage and Reactive Power Control
EEE Departmemt, Gokaraju Rangaraju Institute of Engineering and Technology, Hyderabad, India,
The main work focus is on the LCC HVDC reactive power control system with fluid regulated AC voltage. The reactive power and the voltage control capacity of LCC HVDC were examined and demonstrated with controlled condensers. Reactive power control and voltage management have been suggested and associated controllers with variable condensers have been developed on the reverse side of the fuzzy controlled LCC HVDC system. The active corrective side power control is required and a reactive or voltage control has been taken into account in this work. This study looks at the inverter side of the system LCC HVDC with customizable capacitors, reactive power and fluid management of the AC voltage. The usual AC voltage control and PI controller for reactive power is replaced by an injected controller that enhances reaction speed and control. In the MATLAB software with Sim-Power system toolbox, graphs are created using a GUI environment to model the proposed fuzzy-controlled HVDC system.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.