Issue |
E3S Web Conf.
Volume 315, 2021
VIth International Innovative Mining Symposium
|
|
---|---|---|
Article Number | 01006 | |
Number of page(s) | 6 | |
Section | Environment Saving Mining Technologies | |
DOI | https://doi.org/10.1051/e3sconf/202131501006 | |
Published online | 28 October 2021 |
Combined Method of Coal Mining in the Opening of Shallow Layers as a Direction of Innovative Development of Geotechnology
1 T.F. Gorbachev Kuzbass State Technical University, Department of Management Accounting and Analysis, 650000 Kemerovo, 28 Vesennya st., Russian Federation
2 Mining Institute of The Federal Research Center of Coal and Coal-Chemistry of Siberian Branch of the Russian Academy of Sciences, 650000 Kemerovo, 18 Sovyetsky av., Russian Federation
3 Kazakh Humanitarian-Law Innovative University, Department of Finance and Accounting, 11 Mangilik El st., Semey, East Kazakhstan region, 071400, Republic of Kazakhstan
* Corresponding author: kta.bua@kuzstu.ru
In recent years, there has been a decline in the efficiency of coal mining by traditional methods. On the one hand, the volume of coal outside the contour of the cut, which is economically impractical for open-pit mining, is increasing. On the other hand, when using underground geotechnology, the cost of production exceeds the cost of performing mining operations using open geotechnology, this is due to differences in the factors of operation of the open pit and the mine. This circumstance determines the use of open-underground technology for mining coal reserves outside the contour of the open pit as an actual and promising direction. This article describes a methodological approach based on the use of technological schemes for the preparation and treatment of reserves of powerful shallow coal seams, the justification of the parameters of combined geotechnology with a coordinated and balanced development of open and open-underground mining operations with the distribution of reserves for open and open-underground mining of coal reserves beyond the limit contour of the open pit, the preparation of excavation sites directly from its workings and the coordination of production capacity and the speed of their development. Its application will increase the production capacity of the coal mining complex without additional environmental burden and will provide an increased return on investment.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.