Issue |
E3S Web Conf.
Volume 315, 2021
VIth International Innovative Mining Symposium
|
|
---|---|---|
Article Number | 01019 | |
Number of page(s) | 7 | |
Section | Environment Saving Mining Technologies | |
DOI | https://doi.org/10.1051/e3sconf/202131501019 | |
Published online | 28 October 2021 |
Formulation of the Problem for Calculating the Stress State of a Pillar for a Longwall Recovery Room
1 Kuzbass State Technical University, 28 Vesennyaya, Kemerovo, 650000, Russia
2 JSC SUEK-Kuzbass, 1 Vasilieva, Leninsk-Kuznetsky, 652507, Russia
* Corresponding author: eia.pm@kuzstu.ru
Two statements of the problem of calculating the stress state of pillars for a longwall recovery room are proposed. In the first statement, this pillar is located in the coal seam and is not affected by the adjacent extracted panel. The second statement takes into account the geomechanical effect of the adjacent extracted panel. The calculation area consists of the following blocks: the coal seam, the goaf, and the inter-panel pillar. All blocks are affected by their own weight. The problems are solved using the finite element method with pre-determined limiting conditions of the stress state within the solid strata.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.