Issue |
E3S Web Conf.
Volume 318, 2021
Second International Conference on Geotechnical Engineering – Iraq (ICGE 2021)
|
|
---|---|---|
Article Number | 01002 | |
Number of page(s) | 9 | |
Section | Developments in Geotechnical Engineering | |
DOI | https://doi.org/10.1051/e3sconf/202131801002 | |
Published online | 08 November 2021 |
Experimental Pullout Capacity of Screw Piles in Dry Gypseous Soil
Civil Engineering Department, University of Baghdad, Baghdad, Iraq
a mahdi_karkush@coeng.uobaghdad.edu.iq
b omar.fallujii@gmail.com
Screw piles are widely used in supporting structures subjected to pullout forces, such as power towers and offshore structures, and this research investigates their performance in gypseous soil of medium relative density. The bearing capacity and displacement of a single screw pile model inserted in gypseous soil with various diameters (D = 20, 30, and 40) mm are examined in this study. The soil used in the testing had a gypsum content of 40% and the bedding soil had a relative density of 40%. To simulate the pullout testing in the lab, a physical model was manufactured with specific dimensions. Three steel screw piles with helix diameters of 20, 30, and 40 mm are used, with a total length of 500 mm. The helix is continuous over the pile's embedded depth of 400 mm. The results of tests revealed that decreasing the length to diameter (H/D) ratio resulted in a higher pullout capacity of screw piles and a lower corresponding displacement.
Key words: Screw piles / helix / gypseous soil / pullout / displacement
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.