Analysis and research on energy utilization efficiency of port portal crane
1 Tianjin Research Institute for Water Transport Engineering, Key Laboratory of Environmental Protection Technology on Water Transport, Ministry of Transport, Tianjin, China
2 Tianjin Port Zhongmei Huaneng Coal Terminal Co., Ltd
* Corresponding author: eca@foxmail.com
Portal crane is one of the important equipment of bulk terminal, which is specially used for shore loading and unloading operation. It mainly consumes electric energy. In order to clarify the utilization of electric energy during the operation of portal crane and analyze the energy utilization efficiency, a portal crane of a bulk terminal was selected as the research object and the energy utilization was tested. The voltage, current, imbalance, harmonic, power and energy efficiency of portal crane were analyzed in his paper. Some suggestions were put forward to improve the energy utilization efficiency and reduce energy consumption of portal crane.
Key words: Port / Portal crane / Energy utilization efficiency / Harmonic
© The Authors, published by EDP Sciences, 2022
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.