Présentation du réseau de barrages multi-usages de Vendée Eau : Modernisation du barrage de Mervent
Presentation of the network of multi-purpose dams of Vendée Eau: Modernization of the Mervent dam
1 TRACTEBEL, Chef de Projet - Unité Eau France Europe, Agence de Nîmes, 21 allée Boissy d’Anglas, 30000 Nîmes, France
2 VENDEE EAU, Directeur Général, 57, rue Paul Émile Victor, 85036 La Roche-sur-Yon, France
* Corresponding author: anne-sophie.prost@tractebel.engie.com
Depuis soixante ans, Vendée Eau, Service Public de l’eau potable, organise la production et la distribution d’eau potable en Vendée. À partir d’un réseau exceptionnel comportant notamment 13 barragesréservoirs, Vendée Eau assure une production maximale de 200 000m3/j à destination des 430 000 abonnés vendéens et des zones touristiques côtières. Ses barrages contribuent également à l’écrêtement des crues, au soutien d’étiage et à la production hydroélectrique. En tant que Maître d’Ouvrage, Vendée Eau prend en charge les missions de surveillance et les travaux d’entretien et de modernisation de son parc d’ouvrages. Les derniers travaux importants ont été réalisés sur le barrage de Mervent de 2015 à 2019 afin d’augmenter sa capacité d’évacuation des crues. Tractebel est intervenu en tant que Maitre d’OEuvre pour la définition et le pilotage de ces travaux. Ils ont permis de rénover le génie civil, les organes hydromécaniques, les dispositifs de continuité écologique, d’auscultation et de production électrique.
Abstract
For sixty years, Vendée Eau Public Service, has been organizing the production and distribution of drinking water in Vendée. With an exceptional network of 13 reservoirs, Vendee Eau ensures a production of 280 000m3 / day for the 430 000 Vendée subscribers and the coastal tourist areas. Dams also contribute to flood control, low water flows and hydropower. As dam owner, Vendee Eau is responsible for the surveillance, maintenance and modernization of the infrastructures. The last major works were carried out on the Mervent dam from 2015 to 2019 to increase its flood evacuation capacity. Tractebel acted as Engineer for the design and supervision of this work. They include renovation of the civil works, the hydromechanical equipment, the ecological continuity system, the monitoring and electrical production devices.
© The Authors, published by EDP Sciences, 2022
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.