Issue |
E3S Web Conf.
Volume 347, 2022
2nd International Conference on Civil and Environmental Engineering (ICCEE 2022)
|
|
---|---|---|
Article Number | 01014 | |
Number of page(s) | 7 | |
Section | Infrastructure and Building Construction | |
DOI | https://doi.org/10.1051/e3sconf/202234701014 | |
Published online | 14 April 2022 |
Use of asphalt milling material in construction of the roadway
1 WCT Berhad Petaling Jaya, 47301, Malaysia
2 School of Engineering, Monash University Malaysia, Bandar Sunway, 47500, Malaysia
* Corresponding author: joudi.jm@gmail.com
A pilot study on asphalt milling materials as green construction materials to replace virgin aggregates in the roadbase layer for a temporary diversion road at Pan Borneo Highway was conducted by WCT Berhad. Asphalt milling material was milled from the existing road, and various tests were conducted to determine the material characteristics. Based on the laboratory test results obtained, the asphalt milling materials has been used as subgrade for permanent road, the subbase and roadbase for temporary construction access and also the roadbase for temporary diversion road. This paper will discuss on the application of asphalt milling materials in roadbase of temporary diversion road. A 200m Trial section was constructed to obtain performance of milling asphalt materials. The result showed that the temporary road remained in good condition after 30 days of road traffic.
© The Authors, published by EDP Sciences, 2022
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.