Issue |
E3S Web Conf.
Volume 347, 2022
2nd International Conference on Civil and Environmental Engineering (ICCEE 2022)
|
|
---|---|---|
Article Number | 05010 | |
Number of page(s) | 10 | |
Section | Disaster and Construction Management | |
DOI | https://doi.org/10.1051/e3sconf/202234705010 | |
Published online | 14 April 2022 |
A methodology of critical evaluation of the contract selection process used in the construction industry of Kuwait
College of Engineering, Design and Physical Sciences, Brunel University London Department of Civil and Environmental Engineering, Uxbridge UB8 3PH London, Howell Building 249 & 232
* Corresponding author: 2039915@Brunel.ac.uk
This paper investigates and critically evaluate the contract selection process employed in the construction industry of Kuwait. It will fully take into account the insights and opinions of engineers working on major construction projects in Kuwait. The different methods used to select the contract form in the Kuwaiti construction industry will be identified. Questionnaires, surveys and interviews will be used as a means of acquiring relevant information with regard to the country’s major construction industries, This information will be analysed in order to discover the best means to improve the existing system used in Kuwaiti construction contracts for the selection of contract forms and terms of payment which could be benefit by including steps to ensure that types of project delivery system and term of payment in the future construction projects in Kuwait.
© The Authors, published by EDP Sciences, 2022
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.