Issue |
E3S Web Conf.
Volume 352, 2022
7th International Conference on Energy Science and Applied Technology (ESAT 2022)
|
|
---|---|---|
Article Number | 01008 | |
Number of page(s) | 3 | |
Section | Fossil Energy & Geological Engineering | |
DOI | https://doi.org/10.1051/e3sconf/202235201008 | |
Published online | 27 June 2022 |
Petroleum potential analyses for the completed but not producing wells in reservoir P, S sag
The 8th oil producing factory of Daqing Oil Field LLC, Daqing, Heilongjiang, 163414, China
At the end of 2020, the P oil layer in area B had proved geological reserves * million tons, developable geological reserves * million tons, and proved developable reserves * million tons. It is estimated that by the end of 2022, the developable reserves will be * million tons, the remaining developable reserves * million tons, of which * million tons are to be written off, and the undeveloped reserves after written off will be * million tons, and the developable rate of P oil reservoir reserves will reach 96.7%. In the absence of large-scale development in the Fuyu oil layer, it is a problem that must be solved to find the potential of infrastructure in the P oil layer. Completed-nonproducing wells mainly refer to those have not been put into production after completion of drilling. The potential of not constructed after completion of drilling mainly starts from the nature of the oil and water developed in a single well and the thickness of the reservoir, combined with the position relationship of the well and the relationship between injection and production, to analysis the development potential as oil- water wells or lifting wells.
Key words: Undeveloped reserves / Succession potential / Completed-nonproducing wells / Potential
© The Authors, published by EDP Sciences, 2022
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.