Issue |
E3S Web Conf.
Volume 352, 2022
7th International Conference on Energy Science and Applied Technology (ESAT 2022)
|
|
---|---|---|
Article Number | 01048 | |
Number of page(s) | 4 | |
Section | Fossil Energy & Geological Engineering | |
DOI | https://doi.org/10.1051/e3sconf/202235201048 | |
Published online | 27 June 2022 |
Study on optimal combination of stratified water injection in extra high water cut period
Institute of Geology, No.3 Oil Production Plant, Daqing Oilfield Company LTD., Heilongjiang, Daqing 163000, China
After several decades of mining, the block has entered the development stage of ultra-high water cut. Although the encryption adjustment and subdivision adjustment for different mining objects have been completed, the interlayer interference is still serious and invalid cycle still exists, making it difficult to develop and adjust. The subdivision adjustment of water injection well can further improve the production degree of various oil layers, effectively improve the utilization rate of water injection, and realize the adjustment of water injection well profile and water injection structure, which is one of the measures with low investment that can effectively improve the development effect of water flooding. To satisfy the needs of the reservoir, fine reservoir, operation based on the production dynamic data and based on the analysis of monitoring data, the application of multidisciplinary reservoir description technology, quantitative analysis of thin layered segment permeability variation coefficient, monolayer onrush of small layer in the paragraph number, interval number, sandstone thickness influence on subdivision adjustment effect, analysis of well test cycle and operation costs influence on economic benefits, A series of combination parameters of subdivision water injection interval are obtained, which can guide the subdivision water injection program, effectively alleviate the range of production decline and water cut rise, and provide technical support for fine tapping potential of water flooding in ultra-high water cut period.
Key words: Extra high water cut stage / Subdivision water injection / Interval / Input-output ratio
© The Authors, published by EDP Sciences, 2022
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.