Post Evaluation of Power Grid Project Based on Rough Set and Improved Multi-Level Extension Assessment
China Electric Power Research Institute China
Post evaluation of power grid investment and construction project is an important part of power grid construction project. The effect of post evaluation will directly affect the quality level of project construction. Therefore, this paper proposes an improved post evaluation system based on rough set and fuzzy multi-level extension. Firstly, the main factors affecting the function effect of power grid construction project are analyzed. Then, the improved fuzzy multi-level extension evaluation model is constructed by combining fuzzy comprehensive evaluation theory with multi-level extension evaluation method. Finally, a 220 kV substation construction project is taken as an example to verify the validity and rationality of the model.
© The Authors, published by EDP Sciences, 2022
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.