Issue |
E3S Web Conf.
Volume 358, 2022
5th International Conference on Green Energy and Sustainable Development (GESD 2022)
|
|
---|---|---|
Article Number | 02002 | |
Number of page(s) | 4 | |
Section | Regular Contributions | |
DOI | https://doi.org/10.1051/e3sconf/202235802002 | |
Published online | 27 October 2022 |
Design of Flexible Interactive Platform System between Self-owned Power Plant and Power Grid
1 Shandong Electric Power Research Institute, Jinan, China
2 State Grid Shandong Electric Power Company., Ltd, Jinan, China
* Corresponding author: zhulingkai@woyoxin.com
In response to the call of the state to deepen power system reform, strengthen and standardize the supervision and management of coal-fired captive power plants, and implement regulation from the load side to effectively ensure the power supply and demand balance of the power grid, a flexible interactive platform system between captive power plants and the power grid is developed. The platform software has the functions of self owned power plant file management, resource adjustable potential analysis, operation state detection, energy consumption analysis, transaction management, etc., and the response time to power grid interactive instructions is less than 10 seconds.
© The Authors, published by EDP Sciences, 2022
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0 (http://creativecommons.org/licenses/by/4.0/).
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.