Issue |
E3S Web Conf.
Volume 376, 2023
International Scientific and Practical Conference “Environmental Risks and Safety in Mechanical Engineering” (ERSME-2023)
|
|
---|---|---|
Article Number | 05014 | |
Number of page(s) | 6 | |
Section | V Socio-cultural, Political, Economic, and Legal Issues Related to Environmental Stewardship | |
DOI | https://doi.org/10.1051/e3sconf/202337605014 | |
Published online | 31 March 2023 |
Risks of IT technology adoption
Samara State Economic University, 141, Soviet Army str., 443090 Samara, Russia
* Corresponding author: bnn371@yandex.ru
Automation of technological processes and digitalisation of various spheres of the economy are among the key management tasks. The main threats and risks to development include cross-border threats and illegal use of information and telecommunication technologies, including computer attacks on the information infrastructure and means of communication. The primary task in solving problems of cyber security is introduction of domestic technologies and software products. In this article, we consider the risks of adopting new IT-technologies. Initially, the risks at each stage of project implementation and introduction of IT-technologies were identified, then the methodology of risk assessment was applied based on the determination of risk probability and degree of negative consequences realization (losses for the organization). Each risk was assessed taking into account two items. The first is the probability of risk occurrence. The second is the danger of risk or adverse consequences (losses) which arise at the organisation in case of its realisation. To determine the degree of risk of risks, 4 priority groups were allocated, the weighting values of the groups, and the risks were calculated. Subsequently, each risk was assessed and the risks of implementing new IT technologies were ranked. The research showed that the main risks of IT implementation include innovation risks, information security risks, risks connected with decrease of productivity and capacity of information systems, with changes in the project budget, miscalculations in selection of techniques, equipment, its installation, insufficient qualification of executors. The grouping of risks by stage of their occurrence showed that the risks increase and have the highest aggregate assessment at the stage of operation. Risks are managed throughout the life of the project, but the ability to manage risk decreases as the project progresses towards completion. Identifying, assessing and ranking risks is the basis for developing an effective risk management system
© The Authors, published by EDP Sciences, 2023
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.