Issue |
E3S Web Conf.
Volume 385, 2023
2023 8th International Symposium on Energy Science and Chemical Engineering (ISESCE 2023)
|
|
---|---|---|
Article Number | 01020 | |
Number of page(s) | 6 | |
Section | Energy Development and Utilization and Energy Storage Technology | |
DOI | https://doi.org/10.1051/e3sconf/202338501020 | |
Published online | 04 May 2023 |
Efficiency Evaluation of New Energy Light-duty Truck Policy in Major Cities of China
China Automotive Technology and Research Center Co. Ltd., Tianjin, 300300, China
* Corresponding author: amengqingsi@catarc.ac.cn
b lidie@catarc.ac.cn
The electrification level of commercial vehicles in China has achieved remarkable development with the support of fiscal and tax policies. In this paper, 15 major cities are selected as samples, and the combined effect of national and local fiscal and tax policies is carefully assessed using the DEA model. The results show that: (1) the comprehensive efficiency of the sample cities is high, indicating that the current policy portfolio has achieved great efficiency in general. (2) Shenzhen, Chengdu and Shanghai are taking the lead in the promotion and penetration of new energy trucks, but the 3 cities fail to achieve the best overall efficiency, with lower scale efficiency and diminished returns to scale. (3) Most of the cities suffer input redundancy, and should further optimize the policy structure and synergy to ensure the efficient implementation of various policies.
© The Authors, published by EDP Sciences, 2023
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.