Issue |
E3S Web of Conf.
Volume 389, 2023
Ural Environmental Science Forum “Sustainable Development of Industrial Region” (UESF-2023)
|
|
---|---|---|
Article Number | 01058 | |
Number of page(s) | 8 | |
Section | Materials Science Innovations, Green Chemistry and Emission Reduction | |
DOI | https://doi.org/10.1051/e3sconf/202338901058 | |
Published online | 31 May 2023 |
The system of priority distribution of the allocated limited electrical capacity of the household
LLC Engineering Center “April”, 13 Schelkovskoe shosse, Moscow, 105122, Russian Federation
* Corresponding author: Toropov@aprilgroup.ru
The structure of household electricity consumption is dependent on many factors, such as time, climate, territorial, historical, social, age, gender, and political factors. Operation of the power grid of households is possible within the allocated power limit and is limited by the devices installed for automatic disconnection of the power supply network. A 6-level hierarchical, with alternating precedence, system of electric power distribution for households is proposed. The highest (first) level is urgent needs and without which in the modern world it is impossible to exist. The second refers to devices to ensure the physiological and social needs of a person, the third is large household appliances. The fourth and fifth levels of the pyramid of household electricity consumption are related to heat supply systems and the concept of thermal inertia of buildings. The sixth is the devices of the lowest priority, supplied with energy according to the residual principle. An example is charging an electric car. The proposed method of distribution of electrical power allows to ensure comfortable living in the household while limiting the total power of the allocated electrical energy.
© The Authors, published by EDP Sciences, 2023
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.