Issue |
E3S Web of Conf.
Volume 389, 2023
Ural Environmental Science Forum “Sustainable Development of Industrial Region” (UESF-2023)
|
|
---|---|---|
Article Number | 06029 | |
Number of page(s) | 8 | |
Section | Sustainable Construction Materials and Technologies | |
DOI | https://doi.org/10.1051/e3sconf/202338906029 | |
Published online | 31 May 2023 |
Analytical study of the actual cost of the completed overhaul of multi-apartment residential buildings in Russia
Moscow State University of Civil Engineering, Yaroslavskoe shosse, 26, 129337, Moscow, Russia
* Corresponding author: nikolenko_199@mail.ru
This paper examines the distinctive features of the pricing system when planning and carrying out overhaul in multi-apartment residential buildings. The authors analyzed the data posted in public resources, after which they were optimized in terms of sufficiency for further research. Due to the qualitative heterogeneity of the data, a unified unit of measure was proposed and introduced for the present value of the overhaul works. To select data and determine their stable relationships in a series, calculations of absolute and relative indicators of variation were performed. The results of the study showed that the coefficient of variation of the average present costs of overhaul of apartment buildings within the framework of the totality of the constituent entities of the Russian Federation is equally homogeneous and heterogeneous for various types of work. It was found that for certain types of work, cost indicators have a stable average, while for others it is impossible to single out this indicator.
Key words: multi-apartment residential building / overhaul / cost of overhaul / aggregated estimated norms / present value of overhaul
© The Authors, published by EDP Sciences, 2023
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.