Issue |
E3S Web Conf.
Volume 391, 2023
4th International Conference on Design and Manufacturing Aspects for Sustainable Energy (ICMED-ICMPC 2023)
|
|
---|---|---|
Article Number | 01217 | |
Number of page(s) | 12 | |
DOI | https://doi.org/10.1051/e3sconf/202339101217 | |
Published online | 05 June 2023 |
Resource Allocation, Scheduling and Planning of a Multi Storeyed Residential Building
1 Department of Civil Engineering, GRIET, Hyderabad, Telangana, India
2 Department of Civil Engineering, VJIT, Hyderabad, Telangana, India
3 Buliding and Construction Technical Engineering Department, College of Technical Engineering, The Islamic University, Najaf, Iraq
4 Uttaranchal School of Computing Sciences, Uttaranchal University, Dehradun 248007 INDIA
* Corresponding author: hv89577@gmail.com
For the purpose of minimising and managing project delays, effective planning and scheduling are essential elements of construction projects. Globalisation has led to an increase in the scale and complexity of construction projects. With the help of project management software, the quantity of paperwork and time required for such initiatives can be reduced. A warning system must be accessible throughout the project to alert the organisation to potential achievements and failures. Today's market offers a variety of computer software applications for project management, including MSP, Primavera P6, and others. Primavera has made it simple to assess the real progress of a construction project to the expected pace of the task. The project management tool Primavera P6 gathers, documents, monitors, regulates, and publishes data on project performance. Planning, allocating, and scheduling resources for a G+4 residential development are all part of this project. This study highlights the value of scheduling and interferes with the software by working on a construction project for a commercial building. This paper effectively demonstrates all the crucial steps, such as generating an EPS, developing a WBS, connecting tasks in accordance with their dependency and resource availability, and determining the Critical Path.
© The Authors, published by EDP Sciences, 2023
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.