Issue |
E3S Web of Conf.
Volume 402, 2023
International Scientific Siberian Transport Forum - TransSiberia 2023
|
|
---|---|---|
Article Number | 05016 | |
Number of page(s) | 5 | |
Section | Solar Energy Conversion, Sustainable Energy and Smart Grid | |
DOI | https://doi.org/10.1051/e3sconf/202340205016 | |
Published online | 19 July 2023 |
Analysis of damage to 35 kv cable lines in the Districts of Tashkent
Tashkent State Technical University named after Islam Karimov, Tashkent, Uzbekistan
* Corresponding author: npirmatov@mail.ru
The article analyzes the damage to the cable line 35 kV in the regions of Tashkent. According to the analysis results, electrical damages in the districts of Tashkent city were detected more often in Shaikhantakhur, Yunsabad, Yashnabad and Almazar districts than in other districts. Electrical damage was mainly in the sleeve -51%, in the cable – 43% and in the funnel – 6%. Moisture, corrosion, mechanical wear, manufacturing defects and other factors are the main causes of this damage.
© The Authors, published by EDP Sciences, 2023
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.