Issue |
E3S Web Conf.
Volume 413, 2023
XVI International Scientific and Practical Conference “State and Prospects for the Development of Agribusiness - INTERAGROMASH 2023”
|
|
---|---|---|
Article Number | 05005 | |
Number of page(s) | 9 | |
Section | Environmental & Energy Management | |
DOI | https://doi.org/10.1051/e3sconf/202341305005 | |
Published online | 11 August 2023 |
Verification of lira-sapr calculation of i-beams with two symmetry axes for general stability in transverse bending in the plane with maximum stiffness
1 Siberian State Automobile and Highway University (SibADI), 5 Mir Ave, 644080 Omsk, Russia
2 Central Research and Design Institute of Building Metal Structures named after N.P. Melnikov, 49, Architektora Vlasova str., 117997 Moscow, Russia
3 JSC B.E. Butoma Shipyard, 4 Tankistov St., 298313 Kerch, Russia
* Corresponding author: makeev608079@mail.ru
The paper considers verification of calculation of split I-beams with two symmetry axes on the general Eulerian stability at transverse bending in the plane of maximum stiffness in the software package (PC) LIRA-SAD. Calculations for various loads are given. Numerical calculation results in PC LIRA-SAP are compared with calculation by analytical formulas of S.P. Timoshenko and V.Z. Vlasov. Conclusions about calculation accuracy in PC LIRA-SAD in comparison with analytical formulas analysis are made.
© The Authors, published by EDP Sciences, 2023
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.