Issue |
E3S Web of Conf.
Volume 415, 2023
8th International Conference on Debris Flow Hazard Mitigation (DFHM8)
|
|
---|---|---|
Article Number | 05006 | |
Number of page(s) | 4 | |
Section | Case Studies and Hazard Assessments | |
DOI | https://doi.org/10.1051/e3sconf/202341505006 | |
Published online | 18 August 2023 |
Simulating two-phase debris flows in HEC-RAS at Hummingbird Creek, British Columbia, Canada
BGC Engineering Inc., Vancouver, V6Z 0C8, Canada
* Corresponding author: khorita@bgcengineering.ca
Debris flows are typically modelled as a single homogeneous surge due to lack of data to support more complex model development and due to lack of time and funding for the practitioner and the communities they aim to support. Coarse debris flows are typically characterized by a coarse front, followed by a muddy slurry, that is then followed by a hyperconcentrated flow phase with lesser sediment concentrations. Presented herein is the modelling for a debris flow hazard assessment for Hummingbird Creek, British Columbia, Canada. Model calibration best matched the observed debris flow deposit when the coarse front and hyperconcentrated flow were modelled separately in two phases allowing for separate flow rheologies to be used for the front and the tail of the debris flow, and allowing for deposition between phases. Further research is needed to understand when simulation of two-phase flow may be most representative, particularly when no calibration data is available.
© The Authors, published by EDP Sciences, 2023
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.