Issue |
E3S Web Conf.
Volume 455, 2023
First International Conference on Green Energy, Environmental Engineering and Sustainable Technologies 2023 (ICGEST 2023)
|
|
---|---|---|
Article Number | 03021 | |
Number of page(s) | 10 | |
Section | Sustainable Technology in Construction | |
DOI | https://doi.org/10.1051/e3sconf/202345503021 | |
Published online | 05 December 2023 |
Bi-Stage Optimization Model For Transportation of Construction Steel: An Indian Case Study
1 Jindal Steel and Power Ltd., India
2 O. P. Jindal Global University, Sonipat, India
3 College of Commerce and Business Administration, Dhofar University, Salalah, Oman
In a steel plant, one of the critical tasks of plant logistics is the transportation of the finished products. A steel company transportation system generally consists of a fleet of load-carrying trailers and rail, which are used to transport finished goods. In this paper, a two-stage mathematical model is developed for an Indian company that helps with strategic planning of the supply of finished construction steel (TMT Bar and Structural Steel) from multiple plant locations to the stockyards and then to the distributors. The transportation cost depends on various factors like the type of transportation mode, loading & unloading charges, and other fixed expenses. The steel demand also varies based on the season and other external factors like COVID-19, government policies, and so forth. The model proposed in the present research facilitates cost-effective network planning by achieving the most appropriate dispatching method considering various factors operating in multiple stages using a mixed fleet of trailers and rail. The model’s key objective is to optimize the transportation cost and demand for construction steel.
Key words: optimization / transportation / construction steel / MILP / COVID-19
© The Authors, published by EDP Sciences, 2023
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.