Issue |
E3S Web of Conf.
Volume 458, 2023
International Scientific Conference Energy Management of Municipal Facilities and Environmental Technologies (EMMFT-2023)
|
|
---|---|---|
Article Number | 01015 | |
Number of page(s) | 6 | |
Section | Energy Management, Energy Conversion and Storage | |
DOI | https://doi.org/10.1051/e3sconf/202345801015 | |
Published online | 07 December 2023 |
Optimization models of repair periods of electrical equipment of self-propelled rolling stock, according to its technical condition
Tashkent State Transport University, 100069 Tashkent, Uzbekistan
* Corresponding author: shuhratassistent@gmail.com
Efficient use of self-propelled rolling stock (SRS) used in the installation and repair of the contact network and track circuit, only from the use of the latest technology and installations in it, but also from an increase in the reliability of each piece of SPE - (self-propelled equipment). The development and widespread introduction of technical diagnostic systems is one of the most important factors in increasing the reliability of equipment efficiency and a sharp reduction in the cost of its operation. It is known that the annual total cost of maintenance of self-propelled rolling stock continues to increase as the network of electrified railways expands. The solution to this problem is possible by increasing the operational and structural reliability and the widespread use of modern methods and technical diagnostic tools during their operation. Currently, the mechanical and electrical parts of the SRS are actually operated without diagnostic tools, therefore, without information about their actual state.
© The Authors, published by EDP Sciences, 2023
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.