Development of preliminary design of the energy system of the Ningdong, Ningxia thermal power plant
1 Institute of Energy, Peter the Great St. Petersburg Polytechnic University, St. Petersburg, 195251, Russian
2 Changchun Institute of Technology, School of Energy and Power Engineering, Changchun, 130012, China
* Corresponding author: zhenyu99@bk.ru
The purpose of this design is to master the basic steps, calculation methods, and equipment selection methods of the thermal power system of the thermal power plant, and to familiarize with the composition, connection, and operation characteristics of the thermal power system through the preliminary design of 600MW thermal power plant thermal power plant. This paper is divided into five parts, selecting the principle thermal system formulation, calculating the principle thermal system, the selection of unit auxiliary equipment, steam pipeline calculation, and selection after and after successful calibration. The preliminary design of the thermal system is completed by drawing the comprehensive thermal system diagram and the local system diagram using the above calculation data.
© The Authors, published by EDP Sciences, 2023
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.