Waste Analysis to Support the Implementation of Lean Construction on Building Project
Civil Engineering Department, National Institute of Technology Malang, 65145, Bendungan Sigura-gura Street No.2 Malang, Indonesia
* Corresponding author: lilawinanda@lecturer.itn.ac.id
In the implementation of a project, it cannot be separated from the name of obstacles or failures. Failure can be caused by waste, including material delays, work repetition, low labour productivity, implementation strategies and poor project planning. Lean Construction handles projects by minimizing waste and trying to produce the maximum value possible. This research aims to identify waste factors in building construction and then analyse the dominant factors of waste. The data was collected using a questionnaire from 23 respondents involved in projects execution and then analysed using the Simple Additive Weighting (SAW) method to find the dominant waste factor in building construction projects in Malang City. According to the calculation, the result shows that the most dominant factor of waste from construction projects in Malang City is waiting criteria with a value of 0,278. Furthermore, the identified results will be used to determine the appropriate strategy towards zero waste.
© The Authors, published by EDP Sciences, 2024
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.