Issue |
E3S Web Conf.
Volume 573, 2024
2024 International Conference on Sustainable Development and Energy Resources (SDER 2024)
|
|
---|---|---|
Article Number | 03015 | |
Number of page(s) | 4 | |
Section | Sustainable Development and Electricity Market Research | |
DOI | https://doi.org/10.1051/e3sconf/202457303015 | |
Published online | 30 September 2024 |
New situation and countermeasures for power grid safety under the background of new power system construction
1 State Grid Energy Research Institute Co., Ltd (SGERI), Integrated Research Institute for Grid Development, China
2 China Electric Power Construction Association, China
3 North China Electric Power University, China
* Corresponding author: 289133604@qq.com
The new power system is an important carrier for building a new energy system and serving the "dual carbon". The power grid is a hub platform for energy conversion, utilization, transmission configuration, and supply-demand docking, and is a key link in building a new power system. A profound understanding of the development characteristics of the new power system is of great significance for grasping the changes in the essential features of safety management. The new power system has undergone significant changes in terms of power generation, user side, and overall system characteristics, posing many challenges to the supply and demand, network, and institutional mechanisms of security governance. It is necessary to pay attention to sufficient power supply, strengthen network security guarantees, establish and improve relevant institutional standards, and ensure high-quality economic and social development with high-level security.
© The Authors, published by EDP Sciences, 2024
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.