Rapid Assessment of Effectiveness Pump Storage Power Plant of Jatiluhur Reservoir
1 Civil Engineering, Faculty of Engineering, Universitas Singaperbangsa Karawang, Indonesia
2 Magister Study Program of Water Resources Management, Faculty of Civil and Environmental Engineering, Bandung Institute of Technology, Jl. Ganesha 10, Bandung, West Java Province, Indonesia, 40132
3 Water Resources Engineering, Faculty of Civil Engineering and Environmental, Bandung Institute of Technology, Indonesia
4 Public Company Jasa Tirta II, Jl. Lurah Kawi No. 1 Jatiluhur, cPurwakarta, Jawa Barat, Indonesia, 41152
* Corresponding author: fatma.nurkhaerani@ft.unsika.ac.id
The reliable discharge calculation for forecasting discharge entering the Jatiluhur Reservoir uses the Thomas Fierring method. In this study, a rapid assessment was carried out on the effectiveness of the PSPP in the Jatiluhur Reservoir in 2040 by also considering changes in water demand downstream of Jatiluhur in 2040. A pumped storage power plant (PSPP) is a renewable energy storage medium for electrical energy. A rapid assessment was carried out on the calculation of the energy and volume produced with the operational hours, the condition of the reservoir being full (+ 106.5 m) and the condition of the reservoir approaching the minimum operating limit (+ 90 m). Based on the study’s results, PSPP at the Jatiluhur Reservoir will produce additional electrical energy of 2,180,763 kWh with a water volume requirement of 6,669,000 m3/day and operational is 2,85 hours. The operational of PSPP will reduce the Water High Level (WHL) of the Jatiluhur Reservoir by 0.12 m (full-time condition) and 0.15 m (minimum operating limit reservoir condition). With the PSPP, it is known that the Jatiluhur Reservoir can still operate normally so that the PSPP can increase electricity production without significantly reducing the WHL and volume of the Jatiluhur Reservoir.
© The Authors, published by EDP Sciences, 2024
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.