Battery Energy Storage System Placement And Sizing In Distribution Networks
JSC Rosseti R&D Center, Russia
* Corresponding author: sorokin_dv@ntc-power.ru
The article discusses the methodology for selecting installation locations and parameters of battery energy storage systems (BESS) in electrical distribution networks. The methodology is applicable to BESS which implement the functions of ensuring the reliability of power supply to consumers (use of BESS as a backup or emergency source of power supply), as well as the function of regulating voltage levels in the electrical network (regulating reactive power by the BESS inverter).
© The Authors, published by EDP Sciences, 2024
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.