Issue |
E3S Web Conf.
Volume 584, 2024
Rudenko International Conference “Methodological Problems in Reliability Study of Large Energy Systems” (RSES 2024)
|
|
---|---|---|
Article Number | 01030 | |
Number of page(s) | 5 | |
DOI | https://doi.org/10.1051/e3sconf/202458401030 | |
Published online | 06 November 2024 |
Influence of the temperature schedule of heating network and using differential pressure regulators on the reliability of heat supply systems
1 Kazan State Power Engineering University, 420066 Kazan, The Republic of Tatarstan, Russia
2 NPO TN-Biotech LLC, 423450 Almetyevsk, The Republic of Tatarstan, Russia
* Corresponding author: skulinaun@mail.ru
The methods of increasing reliability of heat supply systems are analyzed. A digital twin of the existing heat supply system has been created. Various modes operation of the system are modeled and control and decision-making system in the conditions operation of the heat network is considered on the example of one of heat supply systems of the Republic of Tatarstan. The indicators of reliability of heat supply to consumers at using these methods are determined. As a result of the application of control methods and increasing reliability of the thermal power systems, probability of failure-free operation and the coefficient of hydraulic stability of heat supply system were calculated, the influence of the temperature schedule and the use of differential pressure regulators (DPR) on the reliability of the system in general were analyzed. Special attention is paid to the hydraulic balancing of the heat supply system to increase her reliability.
© The Authors, published by EDP Sciences, 2024
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.