Issue |
E3S Web Conf.
Volume 497, 2024
5th International Conference on Energetics, Civil and Agricultural Engineering (ICECAE 2024)
|
|
---|---|---|
Article Number | 02019 | |
Number of page(s) | 7 | |
Section | Civil Engineering | |
DOI | https://doi.org/10.1051/e3sconf/202449702019 | |
Published online | 07 March 2024 |
Integrating Resilience in Construction Risk Management: A Case Study on Peruvian Road Infrastructure
1 Universidad Tecnológica del Perú, Arequipa, Perú
2 Universidad Nacional Mayor de San Marcos, Lima, Perú
* Corresponding author: e19200075@postgradoutp.edu.pe
This research work describes the process of applying resilient risk management on a Peruvian road, as well as the results obtained in the application of this methodology in terms of cost parameters and the perception of project members through surveys. The sample corresponds to the road infrastructure project called "Improvement of the Oyón - Ambo National Road, Section II" located in the high Andean zone of the Pasco region in Peru from 3300 m above sea level to 4800 m above sea level. The research covered a period of 13 months, from June 2020 to June 2021, identifying up to 61 types of frequent risks. The presence of high rainfall was the risk with the greatest impact during the execution of the work; but identifying it, analysing it and planning the anticipated response through a resilient approach allowed corrective actions to be taken that led to recovering the maximum delay in the execution.
© The Authors, published by EDP Sciences, 2024
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.