Issue |
E3S Web Conf.
Volume 515, 2024
International Scientific Conference Transport Technologies in the 21st Century (TT21C-2024) “Actual Problems of Decarbonization of Transport and Power Engineering: Ways of Their Innovative Solution”
|
|
---|---|---|
Article Number | 01013 | |
Number of page(s) | 12 | |
Section | Reducing CO2 Emissions From Vehicles | |
DOI | https://doi.org/10.1051/e3sconf/202451501013 | |
Published online | 12 April 2024 |
Construction of a cable yarding track by mathematical and software methods
1 St. Petersburg State Forestry University, Institutskiy lane, 5, 194021, St. Petersburg, Russia
2 Moscow Aviation Institute, Volokolamskoe highway, 4, 125993, Moscow, Russia
* Corresponding author: anatol-06@bk.ru
Constraining factors for the development of traditional solutions for the development of hard-to-reach logging areas are given. Mathematical and software methods are proposed to calculate the construction of routes for rope-trailer installations. Methods of solving the problem of laying an acceptable optimal route using discrete programming methods under conditions of risk and uncertainty are proposed. On a practical example in typical natural and industrial conditions of the North-West Federal District of the Russian Federation (sq.4 v.39 of the Primorsky district forestry of the Kurortny forestry of St. Petersburg) the construction of a mathematical model for solving the stochastic problem with quantile indices is carried out.
© The Authors, published by EDP Sciences, 2024
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.