Issue |
E3S Web Conf.
Volume 520, 2024
4th International Conference on Environment Resources and Energy Engineering (ICEREE 2024)
|
|
---|---|---|
Article Number | 03017 | |
Number of page(s) | 4 | |
Section | New Progress in New Energy and Resource Utilization Technology | |
DOI | https://doi.org/10.1051/e3sconf/202452003017 | |
Published online | 03 May 2024 |
Quality control measures for seismic exploration data acquisition in front of Longmen Mountain
1 Sinopec, Southwest Oil and Gas Branch, 610041 Chengdu, Sichuan, China
2 Chengdu University of Technology, 610051 Chengdu, Sichuan, China
* Corresponding author’s email: 644379573@qq.com
In front of Longmen Mountain, there is a mountainous area with large terrain elevation differences and dense vegetation. The coupling between detectors in limestone and gravel exposed areas and the surface layer is poor. The completion of blasting wells in gravel areas, as well as the layout and burial of seismic survey lines and detectors in mountainous areas, pose difficulties in seismic exploration. The article dissects the factors that affect the quality of collected data, such as shot point measurement, shot point drilling, detector burial, mountainous survey line layout, and interference source control. Targeted measures to enhance GPS measurement signals, gravel area shot well drilling, and mountainous survey line layout are proposed to effectively improve the quality of collected data and work efficiency, which can provide reference for seismic exploration in mountainous areas.
© The Authors, published by EDP Sciences, 2024
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.