Issue |
E3S Web of Conf.
Volume 524, 2024
VII International Conference on Actual Problems of the Energy Complex and Environmental Protection (APEC-VII-2024)
|
|
---|---|---|
Article Number | 01009 | |
Number of page(s) | 8 | |
Section | Issues of the Energy Complex | |
DOI | https://doi.org/10.1051/e3sconf/202452401009 | |
Published online | 16 May 2024 |
Autonomous mode and parallel operation of an asynchronous generator with the electrical network
1 Tashkent State Technical University named after Islam Karimov, 2A, University St., Tashkent, 100095, Uzbekistan
2 Karshi Engineering Economics Institute, 225, Mustakillik avenue St., Karshi city, Kashkadarya region, 180100, Uzbekistan
3 Karshi institute of irrigation and agrotechnologies of the national research university “TIIAME”, 19, Khonabad shoh street, Karshi city, Kashkadarya region, Uzbekistan
* Corresponding author: a_norboyev@list.ru
This article explains that an asynchronous machine, like other electrical machines, can operate as a motor and generator due to the property of reciprocating motion and that an asynchronous generator is not different in design from an induction motor. The work is devoted to the study of a three-phase asynchronous generator, the magnetic excitation flux of which is formed by a three-phase voltage source and moves relative to the rotor. Ideally, induction generators operate best in a stable region between the idle state and the maximum torque region. In addition, an asynchronous generator connected to a capacitor system can generate sufficient reactive power to operate independently.
© The Authors, published by EDP Sciences, 2024
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.