Issue |
E3S Web Conf.
Volume 561, 2024
The 8th International Conference on Energy, Environment and Materials Science (EEMS 2024)
|
|
---|---|---|
Article Number | 01025 | |
Number of page(s) | 5 | |
Section | Energy System Simulation and Sustainable Development | |
DOI | https://doi.org/10.1051/e3sconf/202456101025 | |
Published online | 09 August 2024 |
Research and suggestions on the grid-connected operation management policy of new energy in Hunan Province
1-3,6-7 Hunan Province Key Laboratory of High Efficiency & Clean Thermal Power Technology, State Grid Hunan Electric Power Company Research Institute, Changsha, Hunan, China
4 Changsha County Datong Xingsha primary school, Changsha, Hunan, China
5 Sunward Intelligent Equipment Co., Ltd, Changsha, Hunan, China
* Corresponding author: 768523087@qq.com
Large-scale new energy access to the power grid will cause a series of problems such as the decrease of system frequency and voltage strength, affecting the safe and stable operation of the power grid. The paper analyzes the impact of new energy access to Hunan power grid, reviews the relevant policies of new energy grid-connected operation and management issued by Hunan, analyzes the problems existing in the current Hunan new energy grid-connected operation and management mode, and puts forward measures and suggestions to optimize the grid-connected operation and management in order to provide reference for promoting the high-quality development of new energy.
© The Authors, published by EDP Sciences, 2024
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.