Issue |
E3S Web Conf.
Volume 565, 2024
2024 5th International Conference on Urban Engineering and Management Science (ICUEMS2024)
|
|
---|---|---|
Article Number | 02009 | |
Number of page(s) | 5 | |
Section | Cultural Tourism Management and Business Innovation Development | |
DOI | https://doi.org/10.1051/e3sconf/202456502009 | |
Published online | 09 September 2024 |
Research on the construction of load management system for power supply guarantee target
China Verification and distribution room (Load control room) State Grid Liaoning Marketing Survice Center, Shenyang 110000, China
a* Gll_yf@163.com
b* 15802482732@163.com
c 821557135@qq.com
In the past two years, due to the frequent combination of extreme weather and high primary energy prices and other factors, resulting in the continuous tension of power supply and demand in many places, the risk of power rationing has gradually increased. In order to implement the strategic decision deployment of the Party Central Committee and The State Council, in the context of “carbon peak, carbon neutral” strategy to ensure the security of power supply work. This paper studies the construction of a load management system for the goal of power supply assurance. Through the overall analysis and unified management of the province’s load, it realizes the transformation from one-way load management to users’ active participation in grid interaction through the construction of system structure, policies, mechanism, and the creation and deepening of fine management application functions such as load forecasting, monitoring, and analysis, and effectively alleviates the imbalance between supply and demand. Ensure the safe and reliable supply of electricity, ensure people’s livelihood electricity, and provide strong support for achieving the “two carbon” goal.
© The Authors, published by EDP Sciences, 2024
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.