Issue |
E3S Web Conf.
Volume 604, 2025
The 4th International Conference on Disaster Management (The 4th ICDM 2024)
|
|
---|---|---|
Article Number | 12001 | |
Number of page(s) | 6 | |
Section | Multi Hazard Risk Assessment and Management | |
DOI | https://doi.org/10.1051/e3sconf/202560412001 | |
Published online | 16 January 2025 |
A case study on risk analysis of machine breakdown using the FMEA method
Industrial Engineering Department, Faculty of Engineering, Universitas Andalas, Padang 25163, West Sumatra, Indonesia
* Corresponding author: primafithri@eng.unand.ac.id
This study addresses the frequent disruptions in PT X, the first cement factory in Indonesia, which affect its productivity and quality. The main problem involves the frequent stoppages of key machinery such as raw mills, kilns, cement mills, and especially coal mills, which are crucial for combustion processes. In 2021, the 6K1 coal mill experienced 384 hours and 38 minutes of downtime, with the Rotary 6K1A03 component being the most problematic, causing 205 out of 359 total disruptions. The Failure Mode and Effect Analysis (FMEA) method was employed to analyze these disturbances. The analysis revealed a critical Risk Priority Number (RPN) value of 5.148, with eight factors exceeding this threshold, including the high current in Rotary 6K1A03, with RPN values of 90, 35, 25, 24, 9, 8, and 6. These critical factors are prioritized for intervention. Consequently, it is imperative to implement management and risk mitigation strategies to address these issues and enhance the operational efficiency of the factory.
© The Authors, published by EDP Sciences, 2025
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.