Issue |
E3S Web Conf.
Volume 617, 2025
2024 International Conference on Environment Engineering, Urban Planning and Design (EEUPD 2024)
|
|
---|---|---|
Article Number | 02018 | |
Number of page(s) | 4 | |
Section | Study on Urban Renewal and Low Carbon Transport and Energy Systems | |
DOI | https://doi.org/10.1051/e3sconf/202561702018 | |
Published online | 21 February 2025 |
Analysis and Thinking on the Difficulties of Substation Location in Guizhou under the Background of New Energy
China Power Engineering Consulting Group Guizhou Electric Power Design and Research Institute Co., Ltd., Guiyang, Guizhou, China
* a 1259444711@qq.com, b 2039185515@qq.com, c baishujuan-gzy@powerchina.cn, d chenhuafeng-gzy@powerchina.cn
This paper takes the site selection of power supply side substation in Guizhou as an example, analyzes and discusses the characteristics of this kind of substation site selection process, and provides a new idea and way for the site selection of power supply side substation under the background of new energy.
© The Authors, published by EDP Sciences, 2025
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.