Issue |
E3S Web Conf.
Volume 625, 2025
5th International Conference on Environment Resources and Energy Engineering (ICEREE 2025)
|
|
---|---|---|
Article Number | 03008 | |
Number of page(s) | 14 | |
Section | Resource Management and Ecosystem Regulation | |
DOI | https://doi.org/10.1051/e3sconf/202562503008 | |
Published online | 17 April 2025 |
Integrating Qualitative and Quantitative Methods for Water Resources Carrying Capacity Ⅱ: Application
1 Yunnan Institute of Water & Hydropower Engineering Investigation, Design Co., Ltd, Kunming, Yunnan, 650021, China
2 State Key Laboratory of Water Resources Engineering and management, Wuhan University, Wuhan, Hubei, 430072, China
3 Yunnan Institute of Water & Hydropower Engineering Investigation, Design and Research, Kunming, Yunnan, 650021, China
* Corresponding author’s e-mail: chenjinming@163.com
The study focused on the application of theory and methods of the distributed quantitative assessment model and the dynamic feedback qualitative assessment of water resources carrying capacity (WRCC). The WRCC over eight typical areas of longitudinal Ridge-gorge region and plateau basin of Yunnan were studied. Results show that the results by quantitative assessment were consistent with that by qualitative assessment and accords with the fact, suggesting that theory and methods of the distributed quantitative assessment model and the dynamic feedback qualitative assessment of WRCC were useful for the study of WRCC. Results by two evaluation method suggest that the eight typical areas were areas of water shortage, and the local water resources could not bear the development of society and economy. It would a bad condition of the WRCC from 2020 to 2030 in eight typical areas. What’s more, a worsening trend would happen gradually during the following twenty years, suggesting that conflict between water supply and water demand becoming much fierce day by day. However, with inerbasin water transfer, WRCC enhanced significantly in contrary to that without interbasin water transfer, and rising trend would happen in the period of 2012-2030. Water resources in Zhongdian area could bear the development society and economy completely in the future, and that in the other typical area could also satisfy the requirements for the development of society and economy. In order to ensure sustainable socio-economic development, the construction of interbasin water transfer projects was very necessarily.
© The Authors, published by EDP Sciences, 2025
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.