Summary of the new EUROCODE EN 1997-3: Clause 9
1 International Centre for Numerical Methods in Engineering (CIMNE), Department of Civil and Environmental Engineering, Universitat Politècnica de Catalunya·BarcelonaTech (UPC), and VSL, UPC Campus Nord, 08034 Barcelona, Spain E-mail: ivan.puig@upc.edu, web site: https://www.cimne.com/sgp/dir/Profile.aspx?id=546
2 Consultant, Milano, Italy E-mail: pietro.rimoldi@gmail.com
3 Geoquest, 280 avenue Napoléon Bonaparte, 92500 Rueil-Malmaison, FRANCE E-mail: nicolas.freitag@geoquest-group.com, web page: https://www.geoquest-group.com
Clause 9 of the new Eurocode 7 “EN 1997-3: Geotechnical design” Part 3 (Geotechnical structures) is a new section dedicated to Reinforced fill structures, addressing reinforced wall and abutments, reinforced slopes, basal reinforcement for embankments (including load transfer platforms over inclusions and areas prone to development of voids), and veneer reinforcement. Both Ultimate Limit States and Serviceability Limit States design requirements are presented. This extended abstract summarizes -in an almost verbatim way-main content given in the EN 1997-3 (Clause 9) and EN 1997-1 (Clause 8.2).
© The Authors, published by EDP Sciences, 2025
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.