RWE light house project case study: Moerdijk high hydrogen conversion
1 RWE, Trigonos Building, Windmill Hill Business Park, Swindon, SN5 6PB, UK
2 General Electric Vernova, 58 Charles Street, Cambridge, Massachusetts, USA
* Corresponding author: james.bain@rwe.com
Hydrogen is considered a key technological solution to decarbonise many heavy industries, including in the power sector to fuel Gas turbines (GT). Typically, GTs operate on carbonaceous fuels such as natural gas, which produce CO2 emissions. To avoid further emission of CO2 into the atmosphere and avoid stranded assets, conversion of in-the-field assets is a key aspect for the low-cost attainment of low-carbon operation. This paper highlights the feasibility work on-going at RWE’s Moerdijk GE Vernova 9F.04 (9F.02) F-class 420 Mwe CCGT Power Station, located in the Netherlands. It presents a case study of the hydrogen conversion to 80+ vol-% outlining the technical, operational and environmental considerations involved. This study outlines the fuel supply chain integration undertaken to ensure a secure supply of hydrogen can be delivered to site through either leveraging existing or new infrastructure and an overview of the technical developments to convert the asset (GE 9F.04) to operate on hydrogen containing fuels, involving retrofitting with the latest OEM combustion technology. An overview of the lifecycle emissions reduction and operational cost implications are also included.
© The Authors, published by EDP Sciences, 2025
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.