Hydropower and Sediment Siltation Evaluation Research
A Case Study of X Hydropower Station in Southwest China
Dehong Normal University, Dehong, Yunnan, China
* Corresponding author: This email address is being protected from spambots. You need JavaScript enabled to view it.
Abstract
With the acceleration of China's energy structure transition and the successful completion of the “14th Five-Year Plan” targets, hydropower's position as a backbone of clean energy has been continuously strengthened. Based on the latest 2025 hydropower data and energy policies, combined with modern sediment management methods, this paper conducts an optimized evaluation of the engineering tasks, installed capacity, and operation schemes of X Hydropower Station in Southwest China. In terms of sediment siltation assessment, the SUSBED-2 one-dimensional steady non-uniform flow sediment transport model was used to compare three operation schemes. The results show that the flood season restriction water level of 1,098 m can effectively control the reservoir capacity loss rate within 44%. The study indicates that an installed capacity of 120 MW for X Hydropower Station is the optimal solution balancing economic benefits and engineering feasibility.
© The Authors, published by EDP Sciences, 2026
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.