E3S Web Conf.
Volume 7, 2016
3rd European Conference on Flood Risk Management (FLOODrisk 2016)
Article Number 01009
Number of page(s) 10
Section Probability of floods and storms
DOI https://doi.org/10.1051/e3sconf/20160701009
Published online 20 October 2016
  1. Wood J. (2013). Province boosts cost of Alberta floods to $6 billion. Report prepared for Calgary Herald dated September 23, 2013. [Google Scholar]
  2. Church M. (2013). Steep headwater channels. Treatise on Geomorphology, Vol. 9, Academic Press, pp. 528–549. [CrossRef] [Google Scholar]
  3. Jordan P. and Slaymaker O. (1991). Holocene sediment production in Lillooet River basin, British Columbia: A sediment budget approach. Geographie physique et Quaternaire, 45(1), 45–57. [CrossRef] [Google Scholar]
  4. Dadson S.J. and Church M. (2005). Post-glacial topographic evolution of glaciated valleys: a stochastic landscape evolution model. Earth Surface Processes and Landforms, 30(11), 1387–1403. [CrossRef] [Google Scholar]
  5. Friele P.A. and Clague J.J. (2002). Younger Dryas readvance in Squamish river valley, southern Coast Mountains British Columbia. Quaternary Science Reviews, 21(18-19), 1925–1933. [CrossRef] [Google Scholar]
  6. BGC Engineering (BGC). (2014). Hydroclimatic Analysis of the June 2013 Storm. Report prepared for the Town of Canmore dated August 1, 2014. [Google Scholar]
  7. BGC Engineering Inc. (BGC). (2014). Cougar Creek Debris Flood Hazard Assessment. Report prepared for the Town of Canmore dated March 7, 2014. [Google Scholar]
  8. Environment Canada. 2010. Canadian monthly climate data and 1981-2010 normals. Environment Canada, Ottawa, Ontario. [Google Scholar]
  9. BGC Engineering Inc. (BGC). (2013). Cougar Creek 2013 Forensic Analysis and Short-term Debris Flood Mitigation. Report prepared for the Town of Canmore dated December 11, 2013. [Google Scholar]
  10. BGC Engineering Inc. (BGC). (2014). Three Sisters Creek Debris Flood Hazard Assessment. Report prepared for the Town of Canmore dated October 31, 2014. [Google Scholar]
  11. BGC Engineering Inc. (BGC). (2014). Jura Hazard Debris Flood Hazard Assessment. Report prepared for the Municipal District of Bighorn dated March 1, 2015. [Google Scholar]
  12. BGC Engineering Inc. (BGC). (2014). Cougar Creek Debris Flood Risk Assessment. Report prepared for the Town of Canmore dated June 11, 2014. [Google Scholar]
  13. BGC Engineering Inc. (BGC). (2015). Flood Mitigation Prioritization. Report prepared for Alberta Transportation, January 20, 2016 [Google Scholar]
  14. BGC Engineering Inc. (BGC). (2015). Steve’s Creek Debris-Flow Hazard Assessment. Report prepared for the Municipal District of Bighorn dated November 23, 2015. [Google Scholar]
  15. BGC Engineering Inc. (BGC). (2015). Harvie Heights Creek Debris-Flood and Debris-Flow Hazard Assessment. Report prepared for the Town of Canmore dated June 5, 2015. [Google Scholar]
  16. BGC Engineering Inc. (BGC). (2015). Harvie Heights Creek Debris-Flood Risk Assessment. Report prepared for the Town of Canmore dated May 27, 2015. [Google Scholar]
  17. BGC Engineering Inc. (BGC). (2015). Harvie Heights Creek Preliminary Debris-Flood and Debris-Flow Mitigation Design. Report prepared for the Town of Canmore dated May 25, 2015. [Google Scholar]
  18. BGC Engineering Inc. (BGC). (2015). Grotto Creek Debris-Flood Hazard Assessment. Report prepared for the Municipal District of Bighorn dated May 22, 2015. [Google Scholar]
  19. BGC Engineering Inc. (BGC). (2015). Heart Creek Debris-Flood Hazard Assessment. Report prepared for the Town of Canmore dated April 30, 2015. [Google Scholar]
  20. BGC Engineering Inc. (BGC). (2015). Heart Creek Debris-Flood Risk Assessment. Report prepared for the Town of Canmore dated April 27, 2015. [Google Scholar]
  21. BGC Engineering Inc. (BGC). (2015). Heart Creek Preliminary Debris-Flood Mitigation Design. Report prepared for the Town of Canmore dated April 24, 2015. [Google Scholar]
  22. BGC Engineering Inc. (BGC). (2015). Stoneworks Creek Debris-Flow Hazard Assessment. Report prepared for the Town of Canmore dated April 10, 2015. [Google Scholar]
  23. BGC Engineering Inc. (BGC). (2015). Exshaw Creek and Jura Creek Debris Flood Risk Assessment. Report prepared for the Municipal District of Bighorn dated March 1, 2015. [Google Scholar]
  24. BGC Engineering Inc. (BGC). (2015). Exshaw Hazard Debris Flood Hazard Assessment. Report prepared for the Municipal District of Bighorn dated March 1, 2015. [Google Scholar]
  25. BGC Engineering Inc. (BGC). (2015). Exshaw Creek and Jura Creek Preliminary Debris-Flood Mitigation Design. Report prepared for the Municipal District of Bighorn dated March 1, 2015. [Google Scholar]
  26. BGC Engineering Inc. (BGC). (2015). Cougar Creek Debris Floods: Risk Reduction Optimization. Report prepared for the Town of Canmore dated February 2, 2015. [Google Scholar]
  27. BGC Engineering Inc. (BGC). (2015). Three Sisters Creek Debris Flood Risk Assessment. Report prepared for the Town of Canmore dated January 20, 2015. [Google Scholar]
  28. BGC Engineering Inc. (BGC). (2015). Stone Creek Debris-Flow Hazard Assessment. Report prepared for the Town of Canmore dated January 16, 2015. [Google Scholar]
  29. BGC Engineering Inc. (BGC). (2015). Stone Creek Debris-Flow Risk Assessment. Report prepared for the Town of Canmore dated January 13, 2015. [Google Scholar]
  30. Jackson, Jr., L.E. (1987). Debris flow hazard in the Canadian Rocky Mountains. Geological Survey of Canada Paper, 86–11. [Google Scholar]
  31. de Scally F.A. 1999. Alteration and Restoration of Alluvial Fan Processes in the Lower Bow Valley, Banff National Park. Report prepared for Parks Canada: Ecosystem Section, Heritage Resources Conservation, Banff National Park. Kelowna, B.C. [Google Scholar]
  32. AMEC Earth and Environmental (AMEC). (2006). Geohazards Review Highway 40 / Highway 541 corridor, Southwestern Alberta. Report prepared for Alberta Transportation. [Google Scholar]
  33. AMEC Earth and Environmental (AMEC). (2013). Highway and Geohazard Assessments of June 2013 Flood Damage - Highways 940 (Forestry Trunk Road) and 532 (Kananaskis Country) Consulting Services Contract CON0014932. Revision 1–Updated to Non-DRP Site Cost Estimates and Assessments. Report prepared for Alberta Transportation. [Google Scholar]
  34. Alberta Environment and Parks (AEP). (2015). Geo Alberta 1:20k Stream Dataset. Provided by AEP, May 16, 2014. [Google Scholar]
  35. Jakob M. and Jordan J. (2001). Design flood estimates in mountain streams – the need for a geomorphic approach. Canadian Journal of Civil Engineering, 28, 425–439. [Google Scholar]
  36. Jakob M. Clague J.J. and Church M. (2015). Rare and dangerous: Recognizing extraordinary events on streams. Canadian Water Resources Journal, DOI: 10.1080/07011784.2015.1028451 [Google Scholar]
  37. AMEC Earth & Environmental Ltd. (2007). Sediment Transport and Flood Hydrology in Cougar Creek. Report prepared for Town of Canmore. [Google Scholar]
  38. Water Survey of Canada (WSC). (2010). Hydrometric Data. Available from: http://www.wsc.ec.gc.ca/applications/H2O/indexeng.cfm [accessed July 4, 2014]. [Google Scholar]
  39. Jackson Jr. L.E., Kostaschuk R.A. and MacDonald G.M. (1987). Identification of debris flow hazard on alluvial fans in the Canadian Rocky Mountains. Geological Society of America Reviews in Engineering Geology, 7, 115–124. [CrossRef] [Google Scholar]
  40. Strahler A. (1952). Hypsometric (area-altitude) analysis of erosional topology. Geological Society of America Bulletin, 63(11), 1117–1142. [Google Scholar]
  41. Melton M.A. 1957. An analysis of the relation among elements of climate, surface properties and geomorphology. Office of Nav Res Dept Geol Columbia Univ, NY. Tech Rep 11. [Google Scholar]
  42. Wilford D.J. Sakals M.E. Innes J.L. Sidle R.C. and Bergerud W.A. (2004). Recognition of debris flow, debris flood and flood hazard through watershed morphometrics. Landslides, 1, 61–66. [CrossRef] [Google Scholar]
  43. Wilford D. (2014). Pers. Comm., May 28, 2014. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.