Open Access
Issue
E3S Web Conf.
Volume 65, 2018
International Conference on Civil and Environmental Engineering (ICCEE 2018)
Article Number 06002
Number of page(s) 6
Section Geotechnical Engineering
DOI https://doi.org/10.1051/e3sconf/20186506002
Published online 26 November 2018
  1. Adejumo, T.E. & Boiko, I.L. Pile Foundation and Installation Methods in Nigeria. Faculty of Civil Engineering; Belorussian National Technical University, Minsk, Belarus., 17: 2616. (2012) [Google Scholar]
  2. Lehane, B.M., Pennington, D. & Clark S. Jacked end-bearing piles in the soft alluvial sediments of Perth. Australian Geomechanics Journal, 38(3), 123-134. (2003) [Google Scholar]
  3. Rockhill, D.J., Bolton, M.D. & White, D.J. (2003). Ground vibrations due to piling operations. Proc. BGA Int. Conf. Fndns. 743-756. [Google Scholar]
  4. White, D.J., Finlay, T.C.R., Bolton, M.D. & Bearss, G. Press-in piling: Ground vibration and noise during pile installation. Proc. Int. Deep Fndns. Congress. Orlando. USA. 363-371. (2002) [Google Scholar]
  5. Liu J, Zhang Z, Yu F, and Xie Z. “Case History of Installing Instrumented Jacked Open Ended-Piles” J. Geotech.Geoenviron.Eng, 138(7), 810-820. (2012) [CrossRef] [Google Scholar]
  6. A.D. Deeks, D.J. White & M.D. Bolton. A Comparison of Jacked, Driven and Bored Piles in Sand. University of Cambridge, UK. (2013) [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.